SOBOS Energy Case Studies

Documented Savings: How Clients Eliminated 99% of Generator Run Time

Our case studies document exactly how much our customers save in real dollars, fuel consumption, and emissions reduction

YHI-1 Containerised Power System

Performance metrics and cost savings from our flagship containerised solar generator deployed at a Queensland construction site

Case Study: YHI-1 Containerised System Deployment

This case study details the performance and savings achieved by deploying the YHI-1 containerised solar generator system at a Queensland construction site.
YHI-1 Containerised Solar Generator at Queensland Construction Site

38% less cost

Same amount of power, but much lower operating costs than renting a conventional diesel generator. This translates to significant savings over the project duration.

98% less generator run hours

4582 less hours of generator operation, thanks to the integrated solar array, charger, battery and inverter systems. This dramatically reduces maintenance requirements and extends generator life.

98% less fuel

Only used during inclement weather, lower generator run time yields lower fuel / refueling costs. This significantly reduces operational expenses and maintenance requirements.

30.21 tons CO2 reduction

A direct benefit of lower engine run times and fuel consumption. This significant carbon footprint reduction helps meet sustainability goals and environmental requirements.

Noise abatement

A reduced noise footprint with only less than 40dB (quiet office or refrigerator). This makes it ideal for noise-sensitive environments and improves working conditions.

100% uptime

Remotely monitored by SOBOS with client cloud app login, ensuring reliability is achieved. Continuous monitoring prevents downtime and enables proactive maintenance.

WALA Skid-Based Power System

Proven reliability and significant savings from our transportable skid system deployed at a Queensland construction site.

Case Study: Shadforth Construction Site, Queensland

Partnering with Shadforth, the WALA skid-based system provides reliable, 24/7 off-grid power for their remote Queensland construction site, addressing the typical challenges associated with traditional diesel generators.
WALA PS5 unit at Shadforth construction site

46% less cost

Same amount of power, but much lower operating costs than a conventional diesel generator. This translates to significant savings over the project duration.

99% less generator run hours

8863 less hours of generator operation, thanks to integrated solar array, charger, battery and inverter systems. This reduces maintenance requirements and extends generator life.

99% less fuel

Generator ran primarily for scheduled maintenance checks, significantly cutting fuel use and required oil changes. This minimized refueling logistics and simplified overall site operations.

58.5t less CO2 emissions

Reduced fuel use also cuts NOx, CO, PM & hydrocarbons. This results in cleaner air quality on site and a significantly smaller environmental footprint.

Noise abatement

A reduced noise footprint with only <40dB (quiet office or refrigerator). This makes it ideal for noise-sensitive environments and improves working conditions.

100% uptime

Remotely monitored by SOBOS and with client cloud app login, ensuring reliability is achieved. Continuous monitoring prevents downtime and enables proactive maintenance.

Rent Power Where You Need It, When You Need It

Our rental hybrid generator systems offer superior efficiency, sustainability, and flexibility compared to traditional diesel generators for your off-grid power needs.

Contact Our Specialists

We're ready to discuss your project requirements and provide tailored commercial power solutions.

Phone

0438 073 663

Email

info@sobos.com.au